The Final Inspection

Your last hour of leverage before the house becomes yours: what to check, how to record meter readings, and what to do if something is wrong.

The final inspection (eindinspectie) is the walk-through you do shortly before signing the deeds — usually one to two hours before the notary appointment, with the seller or the selling agent present. It is the last moment at which a problem is still the seller's to fix. An hour later, it is yours.

Weeks or months normally pass between signing the purchase agreement and the transfer. In that time the seller has moved out, taken furniture with them, disconnected appliances and possibly caused damage on the way. The final inspection exists to check that the house you are about to pay for is still the house you agreed to buy.

Why this hour matters more than it looks

Once the transfer deed (leveringsakte) is signed, visible defects become your problem. Dutch law gives a buyer little recourse for something that was there to be seen on the day and was not raised. You keep protection against hidden defects that make normal use of the home impossible, but a cracked worktop, a broken oven or a garden full of rubble is not a hidden defect once you have walked past it.

This is also why the inspection happens before the notary appointment, not after. Your leverage exists only while the seller still needs your money.

What to bring

The walk-through

The house should be empty, bezemschoon (broom-clean), and free of anything not listed as staying. An empty house is revealing — you will see floors, walls and skirting that furniture hid on every previous viewing.

Meter readings

Record electricity (both the high and low tariff registers, if you have them), gas and water. Photograph each meter so the reading and the meter number are legible in one shot.

These numbers close the seller's energy contract and open yours. Getting them wrong is not dramatic, but it produces a wrong opening bill that takes months to unpick. Both you and the seller should sign the inspection form recording them.

A smart meter usually reports itself to the grid operator, but note the readings anyway — you want your own record if the automatic one is disputed.

If you find something wrong

Do not sign and hope. You have three realistic routes, and the notary can arrange all of them if you call before the appointment:

Route How it works When to use it
Deposit (depot) The notary withholds part of the seller's proceeds under a depotovereenkomst recording the defect, the amount, the deadline for fixing it and the conditions for release. The default answer for anything of real value.
Price reduction You agree a figure for the repair and deduct it from the purchase price on the settlement statement. The damage is easy to cost and you would rather fix it yourself.
Postponement Signing is delayed until the seller delivers as agreed. Serious problems only — mortgage offers and redemption statements have expiry dates, so this creates work for everyone.

A depot costs a little extra in notary fees. It is still the cheapest insurance available at that moment, because once you have signed, your only remaining option is to pursue a seller who already has your money.

The penalty clause is not automatic

Purchase agreements carry a penalty — commonly 10% of the purchase price, or 3‰ per day for late delivery. It is widely misunderstood as something that simply applies when a seller falls short. It does not.

To claim it you must first formally give the seller notice of default (ingebrekestelling) and a reasonable period to put things right — often around eight days. Only if they still fail can the penalty be pursued. Treat the clause as a lever for negotiation, not as compensation that arrives by itself.

After the inspection

You go straight to the notary. Read The Notary Appointment for what happens there and what it costs, and The Key Transfer for when the house actually becomes yours. The whole sequence is laid out in the closing timeline.